How to Choose a Design and Build Company

Six questions that separate a design and build company from a company that subcontracts both halves and hopes. What to ask, and what a straight answer sounds like.

By Vladimir Castravet·
Pale oak kitchen joinery against white render walls in a Victorian terrace at Amott Road, Peckham SE15, designed and built by 2VP in one contract

From our Amott Road project — Peckham, SE15

There is 1 question that separates a design and build company from a company that subcontracts both halves and hopes: who employs the designer, and who carries the design risk. Everything else on the comparison spreadsheet is downstream of that answer.

Most advice on choosing a builder is a list of things everybody already knows — get three quotes, check insurance, see previous work. None of it is wrong. None of it distinguishes between two companies that both have a website, both have photographs, and both seem pleasant on the phone.

What follows is the shorter list that actually sorts them.

The question, and what a straight answer sounds like

Ask: who does the design, and who is responsible if the design turns out not to work?

In-house or long-standing partner The company carries the design risk itself. When a detail does not work on site, it is resolved between two people who both work for the party you contracted with — and it is resolved at their cost, because they own both halves.
Introduced designer, separate appointment A traditional arrangement wearing a design-and-build label. You have two contracts, and the gap between the drawings and the building is still yours. That can be the right structure, but you should know you have chosen it.
Marketplace or introducer You are contracting with the builder; the platform's obligation to you is usually the introduction and little more. Ask who signs the building contract, and read what the platform actually commits to if the builder stops answering.

The distinction matters most on the day it is inconvenient. Everybody is aligned in week one. The test is week nine, when a steel is deeper than the drawing assumed and the ceiling height in the room you cared about is now lower than you were shown. Under one structure that is a conversation. Under another it is two companies explaining why it is the other one's fault, with you in the middle adjudicating a technical argument you are not equipped to judge.

That is the whole substance of the choice, and it is covered at length in who carries the gap between the drawings and the building.

Six checks, in the order worth doing them

  1. 01Who employs the designer?. Asked above, and it is first because the other five only matter once you know the answer.
  2. 02Which contract form, and what edition?. Not 'a JCT contract'. The name and the year. For most London extensions the honest answer is Minor Works — what that means is set out in our piece on JCT design and build.
  3. 03Professional indemnity certificate, not a statement.. The only policy that responds to a design error. Ask to see it, and check design is inside the scope rather than assuming it.
  4. 04How are variations priced, and when?. The answer you want is that nothing is charged without your written approval, with the price agreed before the work happens rather than valued afterwards.
  5. 05What are the exclusions in this quote?. A quote that names its exclusions is usually closer to the final figure than one that reads as all-inclusive. Provisional sums are decisions nobody has made yet, not prices.
  6. 06What went wrong on your last job?. Ask the company, then ask their references the same question. The answers should roughly match. A company that has never had anything go wrong has not done many projects, or is not telling you about them.
Key takeaway

Do not ask a reference whether they were happy. Ask what went wrong, how long it took to fix, and who paid. Every real project has that moment, and how it was handled is the only part of a reference worth having.

Where the money question actually belongs

Comparing totals across quotes is the least useful thing you can do with them, because a total is a function of scope and nobody's scope is identical.

Compare, in this order: what is included, what is explicitly excluded, how many provisional sums are standing in for unmade decisions, and what the programme assumes about what will be found behind the plaster. Then compare the numbers.

Most of the difference between two quotes for the same house is not margin. It is a different set of assumptions about the same building, and the cheaper one is frequently the one that has assumed more.

  • Stage 1: Choose the procurement route before you develop the design. Deciding this late throws away most of the benefit of whichever route you pick.
  • Stage 2–3: Shortlist. This is the stage for the six questions above, while you still have leverage and before anyone has drawn anything expensive.
  • Stage 4: Contract particulars — dates, retention, defects period, how variations are valued. The paperwork people skim and then argue about.
  • Stage 6–7: Handover and the defects period. This is when you find out whether 'local enough to come back' was a real answer.

What we would say about ourselves, and the caveat

We are the builder and the design sits with our design and build service rather than with a firm we introduce you to, so there is one contract and one company answerable for both halves. Variations are priced and signed before the work happens, never charged without your written approval. How we run a project is written down so you can check it against what actually happens rather than take it on trust.

The caveat is the same one we would apply to any company answering these questions well: our designer is on our side of the table. If the architecture is the entire reason for your project, appoint somebody independent to hold us to the drawings. That costs you a fee and it buys you a second opinion from someone with no stake in the build programme. It is often worth it, and a contractor who resists it is telling you something.

If you want a range before any of this, the estimator prices off the same rate card we contract from — wide at first, narrower as you answer more.

You pay weekly, against work already done10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period. Your money never gets ahead of the build.
Every variation priced and dated firstNothing is spent on a change until you have approved it in writing, with its cost and its effect on the date.
The measured survey is credited in fullIf you appoint us, the pre-contract survey fee comes off your contract rather than sitting on top of it.
A completion date, in the contractNot an estimate. It is written in, and only a variation you approve can move it.
Common questions

Straight answers

The 2VP Certainty Package

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

Your number in 60 secondsItemised stage breakdown in 2 minutesSurvey within 7 days

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

Before anything is signed
Full measured survey + 3D design visualisation
You see the finished room before you commit to building it
£1,500
RIBA architect design by Nick Elias
Concept, planning and technical drawings by one named architect
£8,000–£15,000
Completion date written into the contract
A date you can plan a life around, not 'TBC at build start'
Included
While we build
No variation without your written approval
Nothing is added to your bill that you did not sign for first
Included
Friday video walkthrough of your site, every week
You know what happened this week without driving over
£1,200/yr
One named project lead, one channel, 24-hour response
You never chase a company — you message a person
Included
Daily photo diary + client dashboard
Everything photographed before it is covered up
Included
Fixtures at our trade pricing, passed through at cost
Our discount is yours, not a margin we keep quiet about
10–20% on materials
After we hand over
6-month snagging visit
We come back once the house has moved and settled
£750
12-month workmanship warranty on second-fix fittings, signed by the trades
The people who built it are on the hook for it, by name
Included
Annual check-ins for 2 years
We come back. Every year. No charge.
Included
Our guarantee
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
What you are not risking
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent
4.8★ from 17 Google reviews — including the 1-star, published in full.
Get my price in 60 seconds

No email needed to see your range. Quotes hold for 21 days, then materials re-price.

We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.

Get my price in 60 secondsDesign & buildBuilders in your areaAll cost guides
If this is your project

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

How fast
  • Your number in 60 seconds
  • Itemised stage breakdown in 2 minutes
  • Survey within 7 days
What you do

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

What protects you
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent

The date is a term of the contract. We finish on the agreed date, or we pay you £500 for every week we are late.

Do not take our word for it

4.8 from 17 Google reviews

Every review is published in full on our reviews page, including the one-star. Google is the only platform we quote a rating for, because it is the only one we can evidence.

★★★★★
As a structural engineer, I've collaborated with 2VP Projects Ltd on several residential projects in London. Their attention to detail, proactive site management, and clear communication make every stage—from design to execution—smooth and efficient. It's rare to find a contractor who values both precision and professionalism at this level. A truly reliable partner.
Igors Smirnovs · Structural engineer we have worked with · June 2025
★★★★★
Great company to work with. Professional, reliable and easy to deal with. Vladimir and the team are always responsive, straightforward and genuinely care about doing things properly. I've had a very positive experience working with 2VP and would happily recommend them.
Sheen Delicatessen · Business client · August 2026
★★★★★
Extension went smoothly from start to finish. Communication was great throughout, and the team delivered exactly what we asked for. Thank you, 2VP!
Dan Martea · August 2026
Warranties and protections

What is covered, and by whom

A builder’s own guarantee is worth exactly as much as the company standing behind it. Here is what comes as standard, what you can add, and what has to come from somebody other than us — set out in full on our insurance and guarantee page.

Included in the contract
  • 12-month workmanship warranty on second-fix fittings
  • £5M public liability
  • £10M employer's liability
  • £2M professional indemnity
Optional, on request
  • HomePro insurance-backed guarantee, 10 years
  • Priced at 2.5% of the contract sum
  • Underwritten by an insurer, so it survives us
Not from us
  • 10-year structural warranty on a new dwelling (NHBC / LABC / Premier)
  • Professional fees — architect, engineer, building control
  • We will tell you when you need one rather than let you find out