New build cost · London · 2026 rate card

How much does a London
new build cost in 2026?
The honest number.

Replacement dwellings, infill plots, garden plots, large new builds or multi-unit schemes — the real 2026 figures we use on client quotes. Sixty-second calculator. No callback.

£3,000–£5,400
per m² turnkey, by type
12–24 months
typical on-site programme
10-year
HomePro insurance-backed warranty
RIBA-led
Nick Elias, Silver Medal architect
The five new-build types

Pick your scale. See the price.

All figures inclusive of design, planning, build, contingency, CIL and VAT. Tighter numbers for your postcode and spec live inside the calculator.

Replacement dwelling
Typical 180–320 m²
All-in
£600k – £1.5m
Per m²
£3,200 – £4,800 / m²
Demolish existing, build modern home on same plot. Permitted-development volume rules apply. Most common London new-build route.
Infill plot — single house
Typical 140–250 m²
All-in
£450k – £1.2m
Per m²
£3,000 – £4,400 / m²
New home on side garden, vacant plot or end-of-row. Planning is the key constraint — needs full planning permission and often a Pre-App.
Garden / backland plot
Typical 130–220 m²
All-in
£550k – £1.4m
Per m²
£3,400 – £5,000 / m²
New home in a rear garden or backland site. Access, overlooking and amenity loss drive planning complexity. Often two-storey with green roof.
Double-plot / large new build
Typical 250–450 m²
All-in
£900k – £2.5m
Per m²
£3,400 – £5,400 / m²
Larger single dwelling on a generous plot. Premium specification, often architect-led with bespoke joinery throughout.
Multi-unit residential
Typical 350–800 m²
All-in
£1.2m – £4.5m+
Per m²
£3,000 – £4,200 / m²
Two or more units on a single plot — pair of houses, terraced row, or small apartment block. Section 106 + CIL apply.
Run the calculator →Read our new-build service page
Where your £1m actually goes

The line-by-line breakdown for a London new build.

Worked example for a typical £1m replacement dwelling in a SW6 or W4 postcode. Every 2VP project gets a line-by-line bill of quantities — never a one-page lump sum.

Substructure — foundations & basement
16%
Piles or strip footings, retaining walls, drainage to mains, waterproofing.
Superstructure — frame, walls, floors, roof
26%
Steel or timber frame, blockwork, floor slabs, roof structure, weathering.
Envelope — windows, doors, cladding, insulation
12%
Triple-glazed units, entrance doors, brick or render facade, full SAP-compliant insulation.
MEP — mechanical, electrical, plumbing
14%
MVHR, heat pump or boiler, underfloor heating, smart electrics, full plumbing infrastructure.
Finishes & joinery
18%
Floors, plaster, paint, doors, full kitchen, bathrooms, bespoke wardrobes.
Design, planning, professional fees & CIL
8%
Architect, structural engineer, M&E consultant, party wall, planning fees, Community Infrastructure Levy.
Preliminaries, contingency & VAT
6%
Site set-up, scaffold, welfare, programme management, 5% contingency, plus 20% VAT.
New build planning & CIL

Every London new build needs full planning.
Here’s the route.

Pre-application

6–8 weeks · £500–£2,500 fee

Submit a design summary to the council planning team and get a non-binding written response on feasibility, key constraints and likely conditions. Almost always worth the fee on contentious sites.

Best for: any new build outside obvious infill sites.

Full planning permission

13–18 weeks · subject to backlog

Detailed drawings, design and access statement, daylight/sunlight assessment, transport statement (if applicable), and consultation. Conservation areas and listed-building proximity add scrutiny.

Required for: every new build, with no exception.

Community Infrastructure Levy (CIL)

Payable on commencement

Per-m² charge most boroughs apply to new floorspace. Typical London rates £20–£500/m² depending on zone. Some councils also apply Section 106 affordable housing or infrastructure contributions on larger schemes.

Required for: most new-build floorspace above 100m² Net Additional.

Recent London new builds

Real prices on real London plots.

See the full portfolio →
Single-dwelling new build in W14 · West Kensington
W14 · West Kensington
Single-dwelling new build
£1.05m
Replacement dwelling in KT2 · Cranes Park
KT2 · Cranes Park
Replacement dwelling
£1.2m
Eco-spec timber cluster in Rural / heritage
Rural / heritage
Eco-spec timber cluster
£890k
New build hall + stairs in W14 · West Kensington
W14 · West Kensington
New build hall + stairs
Part of £1.05m
Free download · 24 pages

The 2026 London New Build Cost Guide.

Real cost data from our London new-build projects. Plot acquisition, planning strategy, CIL by borough, and the seven hidden costs that catch self-builders out.

Already 600+ London homeowners on the list.
Instant access

Send me the guide.

London new build FAQ

What new-build clients ask us.

How much does it cost to build a new home in London in 2026?

Typical 2026 London ranges (inc. design, planning, build, contingency & VAT): infill plots £450k–£1.2m; replacement dwellings £600k–£1.5m; garden/backland plots £550k–£1.4m; large new builds £900k–£2.5m; multi-unit £1.2m–£4.5m+. Per m² costs typically £3,000–£5,000 turnkey, with the Zone 1 / prime central postcodes at the upper end.

What's the planning route for a London new build?

Always full planning permission — there is no permitted development route for an entirely new dwelling. Most projects start with a Pre-Application (£500–£2,500 fee depending on council) to test feasibility before submitting a full application. Conservation areas, Article 4 directions and listed-building proximity add scrutiny. Expect 6–12 months from first sketch to planning consent.

How long does a London new build take?

Allow 6–12 months for design and planning, then 12–18 months on site for a single dwelling, 18–24 months for a large new build, and 24–36 months for multi-unit. The build programme is written into our contract as fixed — late completion is our problem, not yours, with liquidated damages clauses for major delays.

What's CIL and how much will I pay?

Community Infrastructure Levy — a per-square-metre charge most London boroughs apply to new dwellings. Rates vary £20–£500/m² depending on borough and zone. On a 250m² new house in SW6 expect roughly £60k–£100k in CIL. Some councils also apply Section 106 agreements for affordable housing or local infrastructure on larger schemes.

Can I live somewhere else during the build?

On a new build, yes — there's no existing home to live in during construction. Most clients rent locally for 14–24 months. We help with the rental search and align the build programme with break clauses so you're not paying double rent at the end.

Is a Passivhaus or eco-spec new build worth the premium?

Long-term, yes for most clients — full Passivhaus adds 8–15% to build cost but reduces energy bills by 80–90% and adds 10–20% to resale value in prime London postcodes. We've delivered Passivhaus, EnerPHit and AECB-spec new builds. The premium pays back fastest in well-insulated, mechanically ventilated homes with heat pumps.

What does a 10-year guarantee cover on a new build?

Every 2VP new build comes with an insurance-backed HomePro warranty covering structural defects for 10 years from practical completion. If the company ceased trading, an independent insurer would cover repair costs. The warranty satisfies mortgage lender requirements (we can also arrange Premier Guarantee or LABC where the lender specifies).

Do you do design-only or planning-only on new builds?

Yes — design-and-planning is a separately costed stage (typically 6–9% of the total build cost). You can stop after planning consent and tender the build separately, but most clients proceed with us under one fixed-price design-and-build contract. Design fees are credited against the build cost if you proceed.

Nicholas Elias RIBA
Vladimir Castravet
Free feasibility · No obligation

Twenty minutes with Nick Elias RIBA.
On us.

Bring your plot, sketch or planning history. Walk out with a feasibility verdict, planning route, realistic budget and a programme — even if a new build isn’t the right move for your site.

One number. Sixty seconds. No callback.

Price your new build using the same 2026 rate card we quote real clients with.

Price my new build →