CPD for architects · 1 hour · certificate on pass

The most sustainable finish is the one you don’t rip out

Refit carbon, reuse and the systems that keep a fit-out alive past its first lease. Pass the 10-question test and download your 1-hour CPD certificate.

  1. 1Watch and readThe film, the drawings and the rules on this page
  2. 2Pass the test10 questions, 8 to pass, about five minutes
  3. 3Get 1 hour of CPDA certificate PDF with your name, for your CPD record
2VP founder presenting the cumulative refit carbon chart at an architects' CPD on sustainable fit-out
The session

What happens to an interior when the lease ends, and how to specify it so it survives. Every figure carries its source.

Watch

The CPD on film

Sustainable fit-out: the CPD filmWatch on YouTube
Sustainable fit-out, in one minuteWatch on YouTube
Learning outcomes

After this session you can

  1. 1Explain why refit carbon compounds
  2. 2Apply the five-step decision ladder
  3. 3Specify the overlay, the partition and the panel wall
  4. 4Choose joinery board on its EPD
  5. 5Evidence waste by weight
  6. 6Design against the rules that now apply
The size of the problem

Six numbers to carry into a client meeting

61%
of all UK waste is construction and demolition
DEFRA, UK Statistics on Waste (2020)
~25%
of UK emissions come from the built environment
UK Green Building Council
190
kgCO₂e per m² for an average Cat B fit-out
Overbury, Carbon in Cat B Fit-out (2024)
5.5 yrs
average London office lease
Building magazine cost model (Q1 2024)
6%
of UK flat glass is recycled
ASBP, glass-partition reuse guide (April 2025)
93%
of stripped Cat A lighting goes to the skip
UKGBC, End Cat A Lighting Waste
Every refit spends the carbon again

Cumulative kgCO2e per m², one floor plate, if every lease refits from scratch

Cumulative embodied carbon in kilograms of CO2 equivalent per square metre, by successive fit-out
Fit-outCumulative kgCO2e/m²
Fit-out 1 · yr 0190
Fit-out 2 · yr 5.5380
Fit-out 3 · yr 11570
Fit-out 4 · yr 16.5760

760kgCO2e per m² over 20 years, on one floor plate. The ladder attacks the repeat bars, not the first one.

Arithmetic on two sourced figures: 190 kgCO2e/m² average Cat B upfront (Overbury, Carbon in Cat B Fit-out (2024)) × a refit every 5.5-year lease (Building magazine cost model (Q1 2024)). An illustration of accumulation, not a project calculation.

The rules · the decision ladder

Five questions, in order

Ask them of every element. Stop at the first yes.

  1. 1

    Keep

    Does it still do its job where it stands?

    Leave it. Nothing beats the element you never touch.

  2. 2

    Overlay

    Is the substrate sound and stiff?

    Finish over it. The old surface stays in the room.

  3. 3

    Move

    Was it built to come apart?

    Demount and re-erect it on the new layout.

  4. 4

    Change

    Is only the face tired?

    Swap the face, keep the frame.

  5. 5

    Replace

    Everything above said no.

    Last resort, and now a decision you can evidence.

Rung 2 on site · overlay
Resin Over Tiles: No Strip-OutFilm page · Watch on YouTube
The systems, in detail

Overlay, move, change: how each one is built

Rung 2 · Overlay · Spaziocontinuo

Resin over the tiles already there

A 2–3 mm flexible epoxy system by Litokol, laid by our team over sound existing finishes. Nothing broken out.

Waterproof
As a system
Thickness
2–3 mm
Colour
Any RAL
Movement
Flexible
Substrate
Over tile
1
Check the bond, key the surface
2
Fill the joints and cracks
3
Bonding primer
4
First coat, with the mesh
5
Second coat — the mesh disappears
6
Two colour coats
7
Sealer and topcoat
Existing tile, staysBase coats, mesh in the firstColour coats, the layer you seeTopcoat
Resin over existing tile, in the order it goes on. 2VP drawing · explanatory, not to scale
The finished build-up, top layer first
Hydrolux EVO × 2polyurethane topcoat · matt, satin or gloss
Colour coats × 2SpazioResina or SpazioCemento, epoxy
Multifondo EVO, coat 2covers the mesh, at least 12 h later
Multifondo EVO, coat 1 + mesh2 × 2 mm glass fibre, 2 cm overlap
Key, degrease, joints filled
Existing tile — stays in placenothing broken out or carted away
Existing floor or wallmust pass the deflection test
Everything new totals 2–3 mm. Not to scale.
Before anything is laid
Tap test
No hollow tiles
Flatness
≤ 3 mm under a 2 m rule
Screed moisture
≤ 3–3.5% (cement)
Screed strength
≥ 25 N/mm²
Room temperature
Not below +5 °C
Humidity
Not above 80% RH
Six checks before anything is laid. Thresholds from the Litokol installation manual. Fail one and the surface is prepared or stripped, not overlaid.
Wet areas
12345
  1. 1Corner tape bedded into every internal and external corner
  2. 2Three topcoats in a wet area, not two
  3. 3Topcoat taken into contact with the drain
  4. 4Sealant packed round every pipe before fittings go on
  5. 5A fall that lets no water stand
At the shower: the corner, the drain and the pipes. 2VP drawing · explanatory, not to scale
Sections over what is already there
The manufacturer’s test marks
AR 1 Wear
1,5 MPa Pull-off, against a 0,3 MPa requirement
B 2,0 Bond
IR ≥ 4 Impact
ΔL < 3 Staining
A+ · EC1 PLUS Low VOC emission — fine in an occupied home
What it cannot doMove the WC, the basin or the waste runs — they stay where they are. Correct falls — a wet-room floor that drains badly will still drain badly.
What you inheritWhatever is behind the tiles: a slow leak or rotten timber gets sealed in. Repairs are less discreet — there is no joint to hide a patch at.
Where we say noWhere either test fails, a proper strip-out is the honest answer. Walls in gypsum skim, plaster finish or fine mortar do not have the surface strength.
Laid by our team
Finishes and colours
In other settings
Rung 3 · Move · Luconi

Glazed walls that are re-planned, not rebuilt

Demountable systems by Luconi of Ancona, installed in London by AtoZ Design & Glass, our own glazing company. Dry-fixed, and they come apart.

123456
  1. 1Ceiling track
  2. 2Slim upright
  3. 3Glass pane, single or double glazed
  4. 4Doors and frames that match
  5. 5Shelves, timber and cables on the frame
  6. 6Floor track
A glazed run, taken apart. 2VP drawing · explanatory, not to scale
1. Damaged pane
2. Frame unlocked, one pane out
3. New pane in, run untouched
Replace one pane, not the wall. 2VP drawing · explanatory, not to scale
Lease 1 · three officesLease 2 · two rooms, open plandemounted and re-erected, not rebuilt
Rung 3, in plan: the same components, a new layout. 2VP drawing · explanatory, not to scale
Profiles, junctions and sections
In situ

Single glazed divides space and light; double glazed divides sound. Acoustic and fire performance are confirmed in writing for the exact build-up before ordering, and checked room by room against Approved Document B, Table 6.1. Installation photographs show schemes by the manufacturer and its partners; 2VP is the London installer.

Rung 4 · Change · Chameleon

Change the face, keep the frame

An aluminium frame with design panels held by magnets. A refresh changes the panels and nothing behind them.

12345
  1. 1Aluminium frame
  2. 2Magnets on the rails
  3. 3Design panel, lifted off
  4. 4Pressure-fitted at the ceiling
  5. 5Shelving on the same uprights
Panels off, frame stays. 2VP drawing · explanatory, not to scale
Wall cladding
Shelving
Booths
Room dividers
Headboards
Display walls
One frame, many uses. 2VP drawing · explanatory, not to scale
Frame drawings and fixing details
Applied
The rules you design against

Why a refit is now inside the carbon boundary

  1. July 2024RICS Whole Life Carbon Assessment, 2nd edition. Modules B4 and B5 count every replacement, so a refit is inside the carbon boundary.
  2. January 2025ARB mandatory CPD topics. Environmental sustainability became one of two mandatory subjects, alongside fire and life safety.
  3. March 2026UK Net Zero Carbon Buildings Standard. Sets upfront carbon limits that include retrofit, not only new build.
  4. 15 October 2026Draft London Plan consultation closes. Retention-first is the direction of travel for referable schemes.
  5. AlwaysApproved Document B, Table 6.1. A reused wall or ceiling lining still has to meet a fire classification in its new location.
Worked example

What leaves the building

One restaurant, at its second refresh

Waste leaving the building, kilograms

  • Strip out and replace
  • Keep · overlay · move · change
Waste in kilograms leaving the building for each element, comparing strip-out-and-replace against the keep, overlay, move and change ladder
ElementStrip out and replace, kgKeep · overlay · move · change, kg
Floor tiles, 80 m²2,240112
WC wall tiles, 30 m²6300
Dining screen, 6 m5710
Feature wall, 10 m²100130
To the skip3,541242

−93%by mass, on the same four elements, without buying anything the replace route does not also buy.

Floor tiles, 80 m²: overlaid; 5% loose tiles cut out and replaced first. WC wall tiles, 30 m²: overlaid in place. Dining screen, 6 m: demounted and re-erected on the new layout. Feature wall, 10 m²: panel faces swapped, frame retained — the one row where the ladder sheds more mass. Masses are typical rather than weighed on this job. Carbon is deliberately not netted here — the overlay has no published EPD yet, so its whole-life figure is not something we can evidence.

Joinery board

The same cabinet, in five boards

kgCO₂e per cabinet. Declared GWP-fossil A1–A3 per m³ from each maker's EPD, converted at 18 mm. Gold: two makers of the same chipboard.

Chipboard, maker A2.6
Melamine-faced chipboard4.1
Chipboard, maker B5.4
Birch plywood6.4
Chipboard, laminate both faces10.2
Where our data stops

Four things we will not claim

Outstanding from the manufacturers. Until they arrive, we do not assert them.

  • Product EPDs for the resin overlay and the partition system are still outstanding from the manufacturers.
  • Net carbon of overlay against new tile is unknown until those declarations arrive. We weigh the waste instead, because a skip on a weighbridge can be checked.
  • Tested Rw for the partition ranges is outstanding, so we make no acoustic claim for them.
  • Fire classification for profiles, glass and panels is outstanding. Check every room against Approved Document B, Table 6.1.
Portfolio

Stone, glass, joinery and resin, finished to a luxury standard.

Work we have built in London, and the partition and wall systems we supply and install, shown in the best settings they have been used in.

Built by 2VP

Moncler shopfront in stone and bronze on a London street
Stone and bronze shopfrontMoncler, London · retail
Marble portal framing a lit display bay in a retail fit-out
Marble portal and display bayMoncler, London · retail
Green marble walls and floor with a brass inlay beneath a mirrored ceiling — Moncler, London
Green marble and brass corridorMoncler, London · retail
Dark marble stair and portal leading onto the shop floor, with a glazed balustrade — Moncler, London
Dark marble stair and portalMoncler, London · retail
Green marble service counter under a dark timber ceiling in a retail fit-out
Book-matched marble counterMoncler, London · retail
Corridor lined in book-matched marble with lit display cases either side, in a retail fit-out
Stone and timber corridorMoncler, London · retail
Geometric marble floor laid between painted columns in a gallery — V&A Museum fit-out, South Kensington SW7
Geometric marble gallery floorV&A Museum, SW7 · out of hours
Portoro marble column and beam framing the shopfloor in a retail fit-out
Marble column, chevron floorMoncler, London · retail
Calacatta chevron marble floor with a dark marble border and brass strip — Moncler, London
Calacatta chevron floor, brass stripMoncler, London · retail
Circular resin counter, the finish wrapped around the full curve without a single joint
Curved resin counterCommercial fit-out, 2024 · our team
Marble-topped cafe tables on a restored parquet floor — V&A Museum fit-out, South Kensington SW7
Café stone tops, restored parquetV&A Museum, SW7 · hospitality
Island with a seamless worktop and an undermount sink in an open-plan office kitchen
Office kitchen islandCommercial fit-out, 2024 · our team

The systems we install

Warehouse-style black-grid glazing around a lounge with leather sofas, London
Warehouse Style partitions, LondonLondon · Luconi system
Open-plan office with magenta and yellow glass meeting rooms, Milan
Coloured glass meeting rooms, MilanMilan · Luconi system
Glass office with curved corners on a planted office floor
Curved-corner glass officeLuconi system
Black-framed glazed office with timber floor and an orange accent wall
Black-frame glazed officeLuconi system
Meeting room behind yellow-tinted glass with white chairs, Rome
Tinted glass meeting room, RomeRome · Luconi system
Meeting room behind black-framed glazing with statement lighting, Milan
Black-frame meeting room, MilanMilan · Luconi system
Glass-walled room standing inside a period hall with arched windows
Glass room in a period hallLuconi system
Warehouse-style glazing across an open office with timber beams, London
Warehouse Style open office, LondonLondon · Luconi system
Full-height glazed entrance screen into a timber-floored lobby
Glazed entrance lobbyLuconi system
Visualisation: hotel bedroom with a full-height textured panel wall behind the bed
Hotel room panel wallChameleon system · visualisation

“Built by 2VP” is our own work. “The systems we install” shows Luconi and Chameleon systems in schemes delivered by the manufacturer and its partners; 2VP is their London installer, not the contractor on the schemes shown. Visualisations are labelled as such.

The test · 1 hour CPD

Pass the test, get your 1-hour CPD certificate

8 of 10 to pass. Every answer is on this page.

  1. 1.What is the average upfront embodied carbon of a Cat B office fit-out?
  2. 2.With an average London lease of 5.5 years, how many fit-outs does one floor plate see in 20 years if it is refitted every lease?
  3. 3.In the decision ladder, which step comes first?
  4. 4.Which two checks decide whether existing tiles can be overlaid with resin?
  5. 5.How thick is the SpazioResina overlay system over existing tile?
  6. 6.Under the RICS Whole Life Carbon Assessment (2nd edition), which modules bring a refit inside the carbon boundary?
  7. 7.A wall lining is reused in a new room. What fire requirement applies?
  8. 8.On the Luconi partition, how is a single damaged pane replaced?
  9. 9.When a Chameleon wall is refreshed, what changes?
  10. 10.Why is joinery board chosen on its EPD rather than by product name?
0 of 10 answered · pass mark 8

This certificate records completion of a one-hour self-directed learning module and its assessment, for the holder's own CPD record. 2VP is not a RIBA-assessed CPD provider.

Your CPD record

Log it, then bring it to your team

RIBA asks for 35 hours a year, 20 on the core curriculum; ARB names 2 mandatory topics, sustainability among them. Log this as self-directed learning with your certificate as evidence. 2VP is not a RIBA-assessed CPD provider.

Book the session at your studio

45–60 minutes, in person or online.

For the scheme on your desk

Put a real cost against it

Fill in a scope template and you get an elemental cost plan back by RIBA element — from a contractor building in London this week, not a rate book. Free, and it stays yours whoever ends up on site.

Book a CPD session020 8050 8968