Design

Design and Build London: Stage by Stage

What happens on a design and build project in London, from the first call to the end of the defects period — and which decisions cost money if they slip a stage.

By Vladimir Castravet·
Bespoke joinery and new staircase in a Victorian terrace at Moncrieff Street, Peckham SE15, refurbished over 26 weeks with the family living on site

From our Moncrieff Street project — Peckham, SE15

A design and build project runs through 8 recognisable stages, and the build is only one of them. The expensive mistakes are almost never bad workmanship — they are decisions taken one stage later than they should have been, which is a cost you pay without ever seeing it itemised.

People imagine a building project as a construction programme with some paperwork at the front. It is closer to the opposite: a long sequence of decisions, most of them made before anyone arrives, and then a comparatively mechanical period where those decisions get built.

Understanding the order is worth real money, because every decision has a stage where it is cheap and a stage where it is not.

The eight stages, and what each one is for

  • Stage 0–1 · Brief: What you want, what you can spend, and whether the building can take it. This is also where the procurement route is decided, and deciding it late throws away most of the benefit of whichever route you choose.
  • Stage 2 · Concept: The shape of the thing. Massing, layout, where the light comes from. Cheap to change, and the last point at which changing it is cheap.
  • Stage 3 · Developed design: The concept made real enough to submit and to price. Planning goes in around here. Anything you have settled by now is effectively your brief to the contractor, and you own it.
  • Stage 4 · Technical design: Construction drawings, specification, building control, party wall where relevant. The contract is signed here, with the particulars filled in — dates, retention, defects period.
  • Stage 5 · Construction: The visible part. Strip-out, structure, envelope, first fix, plaster, second fix, finishes. Decisions are still being asked of you, and late answers are the commonest cause of delay.
  • Stage 6 · Handover: Practical completion, snagging, certificates, manuals. A retention is normally held from here.
  • Stage 7 · Defects period: A fixed period during which the contractor returns to fix what appears. The balance of the retention is released at the end of it.

Where the money actually leaks

Not in the rates. In the timing of decisions.

Decided at concept Costs drawing time. A layout reconsidered at Stage 2 is an afternoon and a new sketch.
Decided after contract Costs a variation. The work is priced and agreed before it happens, so the number is visible — but it is a number that did not need to exist.
Decided after the trade has been Costs the work twice. Once to build it, once to take it out and build it again, plus the programme days that go with it.

The kitchen layout is the standard example. It feels like a late, decorative decision and it is structural: it sets drainage, ventilation, the electrical first fix, and frequently a steel. Deciding it at Stage 5 means first fix has already been installed against a different assumption.

Key takeaway

There is no such thing as a small late change to anything that touches services. If a decision moves a drain, a duct or a socket, it is a Stage 3 decision no matter how decorative it feels.

What the build stage is made of

Construction is not one undifferentiated block. Every estimate we produce is broken into the same twelve stages, from preliminaries to completion, with a quantity, a unit and a rate on each line — which is what makes it possible to see where money is going rather than watch a single figure move.

That granularity matters to you for one practical reason: it tells you what is happening this week and what has to be decided before next week. A stage-by-stage breakdown is a decision calendar as much as a price.

What is expected of you

  1. 01Settle the route before the design runs away.. Design and build, traditional, or novated. Choosing after a full design exists wastes the advantage of whichever you pick.
  2. 02Answer decisions when they are asked, not when convenient.. Most delays blamed on contractors are decision delays. A trade cannot start until something has been chosen.
  3. 03Approve variations in writing, before the work.. Nothing should be charged without your written approval, and the price should be agreed before the work happens rather than valued afterwards.
  4. 04Read the contract particulars, not just the sum.. Completion date, extension of time, retention, defects period. This is the part people skim and then argue about.
  5. 05Look at what is reported.. Reports are only worth the reading. If what you are shown does not match what you expected, say so that week, not at handover.

Where we fit

We run this as one contract with the design handled by our design and build service, so the decision calendar and the build programme belong to the same people. How we run a project sets out the reporting in detail, and the two companion pieces cover the choice itself — who carries the gap and what you will actually sign.

For a range before any of this starts, the estimator prices off the same rate card we contract from, and narrows as you answer more about the job.

You pay weekly, against work already done10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period. Your money never gets ahead of the build.
Every variation priced and dated firstNothing is spent on a change until you have approved it in writing, with its cost and its effect on the date.
The measured survey is credited in fullIf you appoint us, the pre-contract survey fee comes off your contract rather than sitting on top of it.
A completion date, in the contractNot an estimate. It is written in, and only a variation you approve can move it.
Common questions

Straight answers

The 2VP Certainty Package

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

Your number in 60 secondsItemised stage breakdown in 2 minutesSurvey within 7 days

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

Before anything is signed
Full measured survey + 3D design visualisation
You see the finished room before you commit to building it
£1,500
RIBA architect design by Nick Elias
Concept, planning and technical drawings by one named architect
£8,000–£15,000
Completion date written into the contract
A date you can plan a life around, not 'TBC at build start'
Included
While we build
No variation without your written approval
Nothing is added to your bill that you did not sign for first
Included
Friday video walkthrough of your site, every week
You know what happened this week without driving over
£1,200/yr
One named project lead, one channel, 24-hour response
You never chase a company — you message a person
Included
Daily photo diary + client dashboard
Everything photographed before it is covered up
Included
Fixtures at our trade pricing, passed through at cost
Our discount is yours, not a margin we keep quiet about
10–20% on materials
After we hand over
6-month snagging visit
We come back once the house has moved and settled
£750
12-month workmanship warranty on second-fix fittings, signed by the trades
The people who built it are on the hook for it, by name
Included
Annual check-ins for 2 years
We come back. Every year. No charge.
Included
Our guarantee
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
What you are not risking
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent
4.8★ from 17 Google reviews — including the 1-star, published in full.
Get my price in 60 seconds

No email needed to see your range. Quotes hold for 21 days, then materials re-price.

We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.

Get my price in 60 secondsDesign & buildBuilders in your areaAll cost guides
If this is your project

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

How fast
  • Your number in 60 seconds
  • Itemised stage breakdown in 2 minutes
  • Survey within 7 days
What you do

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

What protects you
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent

The date is a term of the contract. We finish on the agreed date, or we pay you £500 for every week we are late.

Do not take our word for it

4.8 from 17 Google reviews

Every review is published in full on our reviews page, including the one-star. Google is the only platform we quote a rating for, because it is the only one we can evidence.

★★★★★
As a structural engineer, I've collaborated with 2VP Projects Ltd on several residential projects in London. Their attention to detail, proactive site management, and clear communication make every stage—from design to execution—smooth and efficient. It's rare to find a contractor who values both precision and professionalism at this level. A truly reliable partner.
Igors Smirnovs · Structural engineer we have worked with · June 2025
★★★★★
Great company to work with. Professional, reliable and easy to deal with. Vladimir and the team are always responsive, straightforward and genuinely care about doing things properly. I've had a very positive experience working with 2VP and would happily recommend them.
Sheen Delicatessen · Business client · August 2026
★★★★★
Extension went smoothly from start to finish. Communication was great throughout, and the team delivered exactly what we asked for. Thank you, 2VP!
Dan Martea · August 2026
Warranties and protections

What is covered, and by whom

A builder’s own guarantee is worth exactly as much as the company standing behind it. Here is what comes as standard, what you can add, and what has to come from somebody other than us — set out in full on our insurance and guarantee page.

Included in the contract
  • 12-month workmanship warranty on second-fix fittings
  • £5M public liability
  • £10M employer's liability
  • £2M professional indemnity
Optional, on request
  • HomePro insurance-backed guarantee, 10 years
  • Priced at 2.5% of the contract sum
  • Underwritten by an insurer, so it survives us
Not from us
  • 10-year structural warranty on a new dwelling (NHBC / LABC / Premier)
  • Professional fees — architect, engineer, building control
  • We will tell you when you need one rather than let you find out