House Extensions in Fulham SW6: What Hammersmith & Fulham Actually Allows

Three metres, or six with prior approval — then 48 conservation areas and a borough-wide Article 4 that can override both. A Fulham contractor on SW6 planning.

By Vladimir Castravet·
House extension under construction on a London terrace — rear extension brickwork closed, opening formed, upper floor glazed

In Fulham the projection limit is not the hard part — the designation is. A single-storey rear extension on a terrace is permitted development up to 3 m, and up to 6 m under prior approval with neighbour consultation. But Hammersmith & Fulham has 48 conservation areas and a borough-wide Article 4 direction in force since April 2018, so the same drawing gets different answers on different streets. Find your designation before you draw. Everything else follows from it.

I have watched this go wrong the same way for years. Someone reads that they can build six metres, has a design done to six metres, and only then discovers the street sits in a conservation area with a character appraisal that will not accept the roof form. The drawing is not adjusted — it is restarted. Months, not weeks.

So this guide runs in the order the job actually runs: designation, route, regulations, neighbours, then the checks that catch the rest. If you want the numbers for your own house, the estimator does that in about two minutes; our extensions page covers the build types and the Fulham page covers what we build locally.

Step one: find your designation, not your dimensions

Every Fulham address sits in one of a small number of planning situations, and which one you are in decides everything downstream — the route, the drawings, the materials, and the programme.

Unconstrained. Standard permitted development applies. The projection limits below are yours, subject to the other Class A conditions on height, eaves and how much of the garden you cover.
Conservation area. One of 48 in this borough. In SW6 that includes Hurlingham, Parsons Green, Walham Green, Moore Park and Sands End. Permitted development narrows, side extensions and some roof work fall away, and materials and proportions are judged against that area's character appraisal.
Article 4. Hammersmith and Fulham confirmed a borough-wide direction that came into force on 26 April 2018, removing permitted development for basements everywhere in the borough. If a basement is anywhere in your thinking, it is a planning application. Not a maybe.
Listed. A different regime again, with listed building consent required in addition to planning. Genuinely specialist — see what we do not do, below.

This takes ten minutes on the council's own map and it is the highest-value ten minutes in the whole project. Do it before you commission a drawing, not after.

Step two: which of the three routes you are on

Assuming you are not listed, a single-storey rear extension takes one of three routes. They are not degrees of difficulty. They are different processes with different clocks.

The first is permitted development: no application at all, though we still recommend a lawful development certificate so the position is on record when you come to sell. The second is prior approval under the larger home extension scheme — still permitted development, but the council must be notified first and adjoining neighbours consulted, and if a neighbour objects the council decides on impact. The third is full planning, which is where you land for anything beyond those limits, for most work in a conservation area, and for any basement in this borough.

Route is decided by the designation and the geometry together, never by the geometry alone. A three-metre extension inside a conservation area is not automatically permitted development.

Step three: the regulations that actually apply

Planning decides whether you may build it. Building regulations decide whether it may stand up, keep warm and stay safe. They are separate consents, and passing one says nothing about the other.

Fulham extension — the rules that actually apply
WhatThe requirementSource
Rear projection, standardSingle-storey rear extension: up to 3 m for a terraced or semi-detached house, 4 m for a detached house, measured from the original rear wall.GPDO 2015, Sch.2 Pt.1 Class A
Rear projection, larger schemeUp to 6 m terraced or semi-detached, 8 m detached — permitted development, but only after prior approval with neighbour consultation.GPDO 2015, Sch.2 Pt.1 Class A
Basements in this boroughPermitted development rights for basement development removed borough-wide; planning permission required. Direction in force 26 April 2018.LB Hammersmith & Fulham Article 4 Direction
Foundation depth (frost)Strip foundations should have a minimum depth of 0.45 m to their underside, except where founded on rock.Approved Document A, §2E4
Foundation depth on clayOn shrinkable clay (Modified Plasticity Index ≥ 10%): not less than 0.75 m low-shrinkage, 0.9 m medium, 1.0 m high — increased where trees are nearby. Most of SW6 is London Clay.Approved Document A, §2E4
Notice to neighboursBuilding on the line of junction, cutting into a party wall, or excavating within 3 m to a lower depth than a neighbour's foundations — statutory notice required before work starts.Party Wall etc. Act 1996, ss.1, 2 and 6
Excavation safetyExcavations must be supported so they do not collapse, and no person may work in an unsupported excavation at risk of collapse.CDM 2015, reg. 22

Approved Documents are statutory guidance to the Building Regulations 2010 for England. Compliance is judged against the Requirements in Schedule 1; the Approved Document shows one way of meeting them. Your building control body has the final word on your specific building.

Step four: the neighbour is a statutory party, not a courtesy

On a Fulham terrace the Party Wall etc. Act 1996 nearly always applies, and homeowners routinely discover it late. Notice has to be served before work starts, and the response period runs from service. That period is not negotiable, it does not shorten because everyone is friendly, and it is the single most common reason a programme slips. Serve early and it costs you nothing. Serve late and it costs you the difference.

The time bridge

Party wall notices are a Stage 3–4 task, not a Stage 5 one. If your builder is talking about notices in the week the scaffold arrives, the programme you were given was never real.

Where this sits in the RIBA Plan of Work

Extensions fail in Stage 5 for decisions that should have been made in Stage 3. Architecture on our projects is delivered by RIBA-registered Nicholas Elias Architects — Nicholas is a RIBA Silver Medal winner, previously an Associate at Haptic Architects and at Foster + Partners before that. You can look the practice up on the RIBA Find directory rather than take our word for it, and the studio page sets out who does what.

  • Stage 1–2: designation established, survey done, feasible envelope agreed. This is where the conservation area is discovered — not later.
  • Stage 3: route chosen and the application or prior approval prepared. Party wall notices identified and dated.
  • Stage 4: structural engineer issues beam and foundation design; building control route confirmed; the specification is written before it is priced.
  • Stage 5: construction only. Building control inspect the excavation before concrete is poured — an inspection that cannot be done retrospectively. Anything found on site that differs from the design goes back to the engineer as a query, not to the gang in the trench.
  • Stage 6: the record — inspection sign-offs, commissioning certificates, as-builts — into the Building Manual and the Health and Safety File.

What we actually see in SW6

Nine out of ten problems on a Fulham extension are one of four things, and all four are decided before anyone lifts a tool.

  • Designation found late. The drawing is done to the permitted development limit, then the conservation area appears. That is a restart, not a revision.
  • Party wall served late. The notice period gets discovered as a delay rather than planned as a task.
  • Clay and trees. Most of SW6 is London Clay, and a mature street tree near a Victorian terrace changes the foundation design. The trial hole tells you. The assumption does not.
  • The rear wall is not what the drawing says. On a 19th-century terrace the existing structure is frequently a surprise, which is why the point where price meets reality has to be agreed before it happens rather than during.

How to check it on your own project

None of this needs a qualification. It needs the right questions, asked at the right moment — which is usually earlier than people think.

  1. 01Find your designation first. Council map, your address, before any drawing is commissioned. Conservation area, Article 4, listed. Ten minutes.
  2. 02Ask which route is being used, in writing. Permitted development, prior approval, or full planning — with the projection in metres. If the answer is vague, the route has not been decided.
  3. 03Ask for the party wall position, with dates. Which neighbours, under which section, and the date notices go out. Not a promise to sort the party wall nearer the time.
  4. 04Ask who the structural engineer is, by name. There should be a beam and foundation design signed by someone. A quotation line saying steels is not a design.
  5. 05Confirm the pre-pour inspection. Building control see the excavation before concrete. Ask for the date and the photographs — it cannot be done afterwards.
  6. 06Ask what happens when something is found. Every honest answer involves a variation. What you want to hear is that it is priced and dated before it is approved, not after it is done.

What we do not do

Better said here than three meetings in. Listed building work needs a specialist conservation practice, and we will point you at one. Basements in this borough are a full planning application with a party wall dimension we would rather you took to a basement specialist. And we do not enter price-only competitions — we are not the cheapest and do not try to be. If price is the only factor we are probably not the right fit, and that is fine.

On how we make money, so you can check the incentives: we profit by surveying properly, pricing the whole scope before contract, and finishing on programme. We do not profit from variations, from delay, or from what is behind a wall. That is why the survey is measured rather than estimated, and why every estimate is broken into the same twelve stages, from preliminaries to completion, with a quantity, a unit and a rate on each line. After a site visit, an itemised quotation follows within 48 hours, priced stage by stage rather than as a single figure.

You pay weekly, against work already done10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period. Your money never gets ahead of the build.
Every variation priced and dated firstNothing is spent on a change until you have approved it in writing, with its cost and its effect on the date.
The measured survey is credited in fullIf you appoint us, the pre-contract survey fee comes off your contract rather than sitting on top of it.
A completion date, in the contractNot an estimate. It is written in, and only a variation you approve can move it.
Common questions

Straight answers

The 2VP Certainty Package

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

Your number in 60 secondsItemised stage breakdown in 2 minutesSurvey within 7 days

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

Before anything is signed
Full measured survey + 3D design visualisation
You see the finished room before you commit to building it
£1,500
RIBA architect design by Nick Elias
Concept, planning and technical drawings by one named architect
£8,000–£15,000
Completion date written into the contract
A date you can plan a life around, not 'TBC at build start'
Included
While we build
No variation without your written approval
Nothing is added to your bill that you did not sign for first
Included
Friday video walkthrough of your site, every week
You know what happened this week without driving over
£1,200/yr
One named project lead, one channel, 24-hour response
You never chase a company — you message a person
Included
Daily photo diary + client dashboard
Everything photographed before it is covered up
Included
Fixtures at our trade pricing, passed through at cost
Our discount is yours, not a margin we keep quiet about
10–20% on materials
After we hand over
6-month snagging visit
We come back once the house has moved and settled
£750
12-month workmanship warranty, signed by the trades
The people who built it are on the hook for it, by name
Included
Annual check-ins for 2 years
We come back. Every year. No charge.
Included
Our guarantee
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
What you are not risking
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent
4.8★ from 16 Google reviews — including the 1-star, published in full.
Get my price in 60 seconds

No email needed to see your range. Quotes hold for 21 days, then materials re-price.

We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.

Get my price in 60 secondsExtensionsExtension costs by areaBuilders in your areaAll cost guides
If this is your project

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

How fast
  • Your number in 60 seconds
  • Itemised stage breakdown in 2 minutes
  • Survey within 7 days
What you do

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

What protects you
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent

The date is a term of the contract. We finish on the agreed date, or we pay you £500 for every week we are late.

Do not take our word for it

4.8 from 16 Google reviews

Every review is published in full on our reviews page, including the one-star. Google is the only platform we quote a rating for, because it is the only one we can evidence.

★★★★★
As a structural engineer, I've collaborated with 2VP Projects Ltd on several residential projects in London. Their attention to detail, proactive site management, and clear communication make every stage—from design to execution—smooth and efficient. It's rare to find a contractor who values both precision and professionalism at this level. A truly reliable partner.
Igors Smirnovs · Structural engineer we have worked with · June 2025
★★★★★
Great company to work with. Professional, reliable and easy to deal with. Vladimir and the team are always responsive, straightforward and genuinely care about doing things properly. I've had a very positive experience working with 2VP and would happily recommend them.
Sheen Delicatessen · Business client · August 2026
★★★★★
Extension went smoothly from start to finish. Communication was great throughout, and the team delivered exactly what we asked for. Thank you, 2VP!
Dan Martea · August 2026
Warranties and protections

What is covered, and by whom

A builder’s own guarantee is worth exactly as much as the company standing behind it. Here is what comes as standard, what you can add, and what has to come from somebody other than us — set out in full on our insurance and guarantee page.

Included in the contract
  • 12-month workmanship warranty
  • £5M public liability
  • £10M employer's liability
  • £2M professional indemnity
Optional, on request
  • HomePro insurance-backed guarantee, 10 years
  • Priced at 2.5% of the contract sum
  • Underwritten by an insurer, so it survives us
Not from us
  • 10-year structural warranty on a new dwelling (NHBC / LABC / Premier)
  • Professional fees — architect, engineer, building control
  • We will tell you when you need one rather than let you find out