Loft Conversions

Hammersmith Loft Conversions: What W6 Allows

40 cubic metres on a terrace, 50 on anything else — the Class B limits, what Hammersmith's conservation areas remove, and what the Article 4 does not touch.

By Vladimir Castravet·
A completed loft conversion bedroom in dark green with an oak platform bed and a rooflight set into the slope, by 2VP

Under Class B of the GPDO a loft conversion can add 40 cubic metres of roof space to a terrace house and 50 to anything else without a planning application — and in a Hammersmith conservation area it can add none at all, because Class B does not apply there. Those two facts decide most W6 loft schemes before anyone draws anything. Our loft conversions page covers what a build involves, the cost hub breaks the figures down by area, and the estimator prices your own roof.

Hammersmith is W6: Victorian and Edwardian terraces with rear gardens, loft potential and shared party walls. That housing stock is why the loft conversion is the most common thing we are asked about here, and why the same three questions come back every time.


1. The volume limit, and what counts against it

B.1(d) caps the increase in the cubic content of the resulting roof space against the original at 40 cubic metres in the case of a terrace house, or 50 cubic metres in any other case. Most of W6 is terrace, so 40 is the number that binds.

Two things people get wrong about it. It is a measure of volume, not floor area — a shallow roof with a wide footprint can exhaust the allowance while giving you a room you cannot stand up in. And it counts against the original roof, meaning any previous enlargement comes off your allowance, including one carried out by an owner two sales ago. That is worth establishing from the council's records before the design assumes a clean sheet.

Three further limits sit alongside it:

  • B.1(b) — no part may exceed the height of the highest part of the existing roof. The ridge is a ceiling, and it is why a hip-to-gable often gains more usable space than raising anything.
  • B.1(c) — nothing may extend beyond the plane of an existing roof slope that forms the principal elevation and fronts a highway. This is the front-dormer rule, and it applies everywhere, conservation area or not.
  • B.1(e) — a verandah, balcony or raised platform is excluded outright, and so is installing, altering or replacing a chimney, flue or soil and vent pipe. On a terrace with a stack in the party wall, that last one catches more loft schemes than people expect.

2. The conservation areas are the real gate

B.1(f) removes Class B entirely where the dwellinghouse is on article 2(3) land — which includes conservation areas. Hammersmith has four: Brackenbury Village, Ravenscourt Park, Stowe Road and Brook Green.

Inside them there is no permitted development route for a roof addition at all. Not a smaller one, not a discreet one at the back: a planning application, every time. That is not a reason to give up — dormers are granted in conservation areas regularly — but it changes the programme by eight to twelve weeks and it changes what the design has to argue. We have written that case up separately in the conservation-area loft guide.

The practical step is the same either way and it takes ten minutes: find your address on the council's own map at lbhf.gov.uk/planning and establish the designation before a drawing is commissioned. A scheme designed for permitted development and then discovered to be in Brackenbury Village is a redesign, not an adjustment.

3. The Article 4 does not do what people think it does

This is the most common misunderstanding we hear in W6, and it costs people money in both directions.

Hammersmith & Fulham has a borough-wide Article 4 direction in force since 26 April 2018. It removes permitted development rights for basement development, everywhere in the borough. It does not touch roofs.

So: if you are digging, that is a planning application wherever you are. If you are converting a loft and you are outside a conservation area, the Article 4 is irrelevant to you — and we have met homeowners who abandoned a perfectly permitted scheme because they had been told the borough had "removed permitted development", which is true of one thing and not of theirs.

4. The conditions that shape the detailing

Class B permits the work subject to B.2, and these are the ones that change what gets built rather than whether it is allowed:

  • B.2(a) — materials must be of a similar appearance to the existing exterior. On a Hammersmith terrace that usually means slate or a close match, and it is the condition a cheap tile choice fails.
  • B.2(b)(i) — other than on a hip-to-gable, or where the roof joins a rear or side extension, the eaves of the original roof must be maintained or reinstated, and the edge of the enlargement nearest the eaves must be not less than 0.2 metres from them, measured along the roof slope. That 200mm set-back is why a well-detailed dormer sits back from the gutter line instead of springing off it.
  • B.2(c) — any window in a side elevation must be obscure-glazed, and non-opening unless the opening parts are more than 1.7 metres above the floor of the room. On a terrace, that is the flank window onto the neighbour.

5. What to settle before you commission drawings

  1. The designation. Conservation area or not. Everything else follows from it.
  2. The original roof volume, and whether any of the 40 cubic metres has already been spent by a previous owner.
  3. The party wall position. Shared walls are the norm in W6 and steels usually bear on them, which brings the Party Wall etc. Act 1996 into the programme — see the party wall cost guide.
  4. Which type the roof actually suits, which is a structural question before it is a taste one: which loft conversion type and hip-to-gable set out the options.

On the jobs we take in W6 we are the builder, not a marketplace: one contract, one named project lead, and no introducer fee stacked on the build cost. If you want a range for your own roof, the estimator prices it stage by stage, and it will tell you what it cannot know yet rather than guessing.

Common questions

Straight answers

The 2VP Certainty Package

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

Your number in 60 secondsItemised stage breakdown in 2 minutesSurvey within 7 days

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

Before anything is signed
Full measured survey + 3D design visualisation
You see the finished room before you commit to building it
£1,500
RIBA architect design by Nick Elias
Concept, planning and technical drawings by one named architect
£8,000–£15,000
Completion date written into the contract
A date you can plan a life around, not 'TBC at build start'
Included
While we build
No variation without your written approval
Nothing is added to your bill that you did not sign for first
Included
Friday video walkthrough of your site, every week
You know what happened this week without driving over
£1,200/yr
One named project lead, one channel, 24-hour response
You never chase a company — you message a person
Included
Daily photo diary + client dashboard
Everything photographed before it is covered up
Included
Fixtures at our trade pricing, passed through at cost
Our discount is yours, not a margin we keep quiet about
10–20% on materials
After we hand over
6-month snagging visit
We come back once the house has moved and settled
£750
12-month workmanship warranty on second-fix fittings, signed by the trades
The people who built it are on the hook for it, by name
Included
Annual check-ins for 2 years
We come back. Every year. No charge.
Included
Our guarantee
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
What you are not risking
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent
4.8★ from 16 Google reviews — including the 1-star, published in full.
Get my price in 60 seconds

No email needed to see your range. Quotes hold for 21 days, then materials re-price.

We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.

Get my price in 60 secondsLoft conversionsLoft conversion costs by areaBuilders in your areaAll cost guides
If this is your project

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

How fast
  • Your number in 60 seconds
  • Itemised stage breakdown in 2 minutes
  • Survey within 7 days
What you do

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

What protects you
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent

The date is a term of the contract. We finish on the agreed date, or we pay you £500 for every week we are late.

Do not take our word for it

4.8 from 16 Google reviews

Every review is published in full on our reviews page, including the one-star. Google is the only platform we quote a rating for, because it is the only one we can evidence.

★★★★★
As a structural engineer, I've collaborated with 2VP Projects Ltd on several residential projects in London. Their attention to detail, proactive site management, and clear communication make every stage—from design to execution—smooth and efficient. It's rare to find a contractor who values both precision and professionalism at this level. A truly reliable partner.
Igors Smirnovs · Structural engineer we have worked with · June 2025
★★★★★
Great company to work with. Professional, reliable and easy to deal with. Vladimir and the team are always responsive, straightforward and genuinely care about doing things properly. I've had a very positive experience working with 2VP and would happily recommend them.
Sheen Delicatessen · Business client · August 2026
★★★★★
Extension went smoothly from start to finish. Communication was great throughout, and the team delivered exactly what we asked for. Thank you, 2VP!
Dan Martea · August 2026
Warranties and protections

What is covered, and by whom

A builder’s own guarantee is worth exactly as much as the company standing behind it. Here is what comes as standard, what you can add, and what has to come from somebody other than us — set out in full on our insurance and guarantee page.

Included in the contract
  • 12-month workmanship warranty on second-fix fittings
  • £5M public liability
  • £10M employer's liability
  • £2M professional indemnity
Optional, on request
  • HomePro insurance-backed guarantee, 10 years
  • Priced at 2.5% of the contract sum
  • Underwritten by an insurer, so it survives us
Not from us
  • 10-year structural warranty on a new dwelling (NHBC / LABC / Premier)
  • Professional fees — architect, engineer, building control
  • We will tell you when you need one rather than let you find out