Modern Kitchen Extension in Wimbledon, London – Full Renovation by 2VP
Modern Kitchen Extension in Wimbledon, London – Full Renovation by 2VP
At 2VP, we recently completed a full home renovation project in Wimbledon, South West London, which included a rear extension, loft conversion, and a standout modern kitchen extension.
This project was designed with clean lines, natural finishes, and a focus on smart, efficient use of space — exactly what modern London homes demand.
Modern Kitchen Extension in Wimbledon, London – Full Renovation by 2VP
At 2VP, we recently completed a full home renovation project in Wimbledon, South West London, which included a rear extension, loft conversion, and a standout modern kitchen extension.
This project was designed with clean lines, natural finishes, and a focus on smart, efficient use of space — exactly what modern London homes demand.
A Calming, Natural Finish: Limewash Walls & Microcement Floors
The kitchen extension was finished with limewash-plastered walls, offering a subtle, earthy texture that softens the modern look. For the flooring, we used microcement — a seamless and highly durable surface, perfect for busy family kitchens that still want a sleek, architectural feel.
Bespoke Steel-Framed Doors & Smart Kitchen Design
To maximise light and garden connection, we installed bespoke steel-framed doors from AtoZ Design and Glass. Their minimalist black frames added just the right amount of industrial contrast, opening up the space to natural light and outdoor views.
For the kitchen, the client chose a cost-effective but high-quality kitchen system from Selection Works. The result was a design-led kitchen that felt bespoke — without exceeding the budget.
Rear Extension + Loft Conversion = True Added Value
Alongside the kitchen, we carried out a loft conversion and a rear extension, transforming this Wimbledon home into a brighter, more spacious, and better-functioning property. These types of combined renovation projects are where we shine — ensuring everything from structure to finish is delivered with clarity and control.
What Made This Project a Success?
✅ Transparent, fixed-price contract
✅ Clear scope defined early with the architect
✅ On-site coordination managed by a single point of contact
✅ All works covered by our 10-year HomePro warranty
✅ Minimal disruption and timely handover
Thinking of Extending or Renovating in South West London?
Whether you're planning a kitchen extension in Wimbledon, a loft conversion in Clapham, or a full-house renovation in Balham, our team is here to help.
👉 Request your free fixed quote today and discover a better way to build — with clarity, no hidden costs, and a calm, professional team you can trust.
Would you like me to generate the meta description, featured image ALT text, or schema markup for this blog as well?
Snagging vs Defects — How to Avoid Confusion in Residential Projects
SNAGGING VS DEFECTS — HOW TO AVOID CONFUSION IN RESIDENTIAL PROJECTS
When completing a new home refurbishment or extension, the last stage is often the most misunderstood. Clients, architects, and contractors use the words “snagging” and “defects” interchangeably — but in construction law, these terms mean very different things.
Understanding this distinction under RIBA and JCT contracts can prevent disputes, speed up payments, and maintain trust between all parties.
Snagging vs Defects — How to Avoid Confusion in Residential Projects
When completing a new home refurbishment or extension, the last stage is often the most misunderstood. Clients, architects, and contractors use the words “snagging” and “defects” interchangeably — but in construction law, these terms mean very different things.
Understanding this distinction under RIBA and JCT contracts can prevent disputes, speed up payments, and maintain trust between all parties.
1️⃣ What Is Snagging?
“Snagging” refers to minor cosmetic or finishing issues identified during the final inspection before or at Practical Completion (PC).
Typical examples include:
Small paint imperfections
Missing sealant
Light switches not aligned
Uneven silicone or a door needing adjustment
Under RIBA Domestic Building Contract Clause 9.10.1 and JCT Minor Works Clause 2.30, these issues do not prevent Practical Completion.
They are recorded in a snagging list, which the contractor agrees to rectify within a short period after handover.
2️⃣ What Are Defects?
A defect is something more serious — it’s a failure in workmanship, materials, or design that prevents the building element from performing its intended function.
Examples include:
Roof leaks due to incorrect flashing installation
Structural movement from improper lintel support
Electrical short-circuits from faulty connections
Plumbing leaks or failure of installed systems
Defects typically appear after Practical Completion and during the Defects Liability (Rectification) Period, which usually lasts six months under RIBA and JCT contracts.
3️⃣ Why the Confusion Happens
Clients often believe any mark or imperfection seen after moving in must be a defect.
However, contract law distinguishes wear and tear (normal use after occupation) from genuine defects.
For example:
A scratch caused while moving furniture is not a defect.
A door misaligned due to thermal expansion may be classed as normal settlement, not a defect.
A roof leak caused by damaged tiles during later maintenance is outside contractor liability.
4️⃣ Legal References (RIBA & JCT)
RIBA Domestic Building Contract Clause 9.10 – Practical Completion
Defines the stage when works are complete “except for minor defects not materially affecting use.”RIBA Clause 9.11 – Rectification Period
Contractor must make good any defects, shrinkages, or faults appearing within the period.JCT Clause 2.30 – Practical Completion
States completion occurs “when the works are complete for all practical purposes, notwithstanding minor defects.”JCT Clause 2.35 – Defects Liability
Contractor must make good defects during the rectification period upon instruction of the Contract Administrator.
5️⃣ How to Manage Snagging and Defects
✅ At Practical Completion:
Conduct a joint walkthrough with the architect or contract administrator.
Record every visible issue in a dated snagging list.
Agree on timescale for rectification (usually 1–2 weeks).
✅ During the Defects Period:
Report any new issues in writing (email is valid).
Allow the contractor reasonable access to inspect and repair.
Avoid independent repairs without notice — this may void warranty rights.
6️⃣ Avoiding Disputes
Most disputes arise from poor record keeping or lack of clear communication.
To protect all sides:
Keep written records of every inspection and correction.
Use photographs with time stamps.
Refer to the Defects Liability Period end date — after this, any new issue becomes maintenance, not a defect.
7️⃣ In Practice
At 2V Projects Ltd, our goal is to help clients and architects achieve a fair and smooth completion.
We follow the JCT/RIBA process precisely:
Practical Completion = project fit for occupation.
Defects Period = contractor responsibility for workmanship issues.
Beyond = client maintenance.
Understanding these principles ensures every project ends on good terms, with transparency and professionalism at its core.
Conclusion
Snagging and defects are two sides of the same completion process — one about finishing, the other about performance.
Handled properly, they protect both the client’s right to quality and the contractor’s right to payment.
Clear understanding avoids unnecessary tension and keeps projects within their contractual framework.